Your office lease is ending and your landlord expects the space returned to its original condition. This is not optional. Almost every commercial lease in Singapore includes a reinstatement clause, and failing to comply means losing your security deposit or worse, facing additional charges.
At Reinstatement Works Singapore, office reinstatement is what we do best. We have restored over 500 offices across Singapore, from small 200 sqft startup spaces to large 10,000 sqft corporate floors. We know what landlords expect, what building management requires, and how to get it done fast without cutting corners.
What Office Reinstatement Involves
Office reinstatement means removing every modification you made during your tenancy and returning the space to its original bare condition. For most offices, this includes the following scope of work:
Demolition and Hacking
All partition walls, meeting room enclosures, reception counters, and built-in structures are demolished and removed. We hack down drywall partitions, glass partitions, and any structural additions made during the tenancy. Our team works methodically to avoid damaging the original building structure.
Ceiling Reinstatement
Suspended ceilings, decorative ceiling panels, recessed lighting, and any ceiling modifications are removed. We restore the ceiling to the original exposed or grid ceiling state as required by your lease. This includes removing all tenant-installed light fittings and replacing them with the original fixtures where required.
Flooring Restoration
Carpet tiles, vinyl flooring, raised access flooring, and any floor overlay installed during your tenancy are removed. We clean and restore the original floor surface. If the original flooring was damaged during removal, we repair it to an acceptable standard.
Wall Works and Repainting
Every wall is inspected, patched, plastered where necessary, and repainted to the original colour. We match the original paint colour and finish to ensure a seamless result that meets your landlord inspection standards.
Electrical and Data Removal
All additional power points, network cabling, data ports, server room infrastructure, and supplementary lighting installed during your tenancy are removed. Cable trays are cleared and all electrical points are properly capped and made safe.
Plumbing Works
Additional water points for pantries, extra washroom fixtures, or any plumbing modifications are removed and properly capped. We ensure all plumbing is restored to the original configuration.
Complete Cleanup and Disposal
We do not leave you with a mess. All demolition debris, removed fixtures, and construction waste are transported and disposed of in compliance with NEA regulations. You get back a clean, empty space ready for handover to your landlord.
Why Office Tenants Choose Us
We Handle Everything
From the initial site assessment to the final landlord inspection, we manage the entire process. You hand us the keys, we hand you back a fully reinstated space. No need to coordinate multiple contractors or deal with building management yourself.
We Know What Landlords Want
After 500+ office reinstatements, we know exactly what landlords and building management teams look for during inspection. We reinstate to a standard that passes inspection the first time, so you get your deposit back without delays.
We Work Fast
Time is money when your lease is ending. We complete most office reinstatements in 2 to 5 days for spaces under 1,000 sqft. Larger offices up to 3,000 sqft typically take 5 to 10 days. We plan the work to minimise disruption and meet your handover deadline.
We Are Fully Licensed and Insured
We hold all required licences for reinstatement, demolition, and renovation works in Singapore. Our comprehensive insurance covers any accidental damage during the reinstatement process, giving you complete peace of mind.
No Hidden Costs
Our quotes are all-inclusive. The price we quote is the price you pay. We do not add surprise charges for debris disposal, building management coordination, or overtime work. Everything is included upfront.
The Office Reinstatement Process
Step 1: Free Site Assessment
We visit your office, review your lease agreement, and assess the scope of work. This is free and comes with no obligation.
Step 2: Detailed Quotation
Within 24 hours of the site visit, you receive a clear, itemised quotation with the total cost and estimated timeline. No hidden fees.
Step 3: Building Management Coordination
We apply for work permits, arrange loading bay access, and coordinate working hours with your building management. You do not have to lift a finger.
Step 4: Reinstatement Works
Our team carries out all demolition, removal, restoration, and painting works. We keep you updated on progress daily.
Step 5: Final Inspection and Handover
We conduct a thorough internal inspection before inviting your landlord for the final walkthrough. We are there during the inspection to address any concerns on the spot.
Get Your Free Quote Today
Every project is different. Contact us now for a free, no-obligation site assessment and quotation within 24 hours.
Call Now: (65) 89289688
WhatsApp: (65) 89289688
Email: enquiry@reinstatementworks.com.sg
Visit Us: 24 Sin Ming Lane #03-92 Singapore 573970
Monday to Friday, 9am to 5pm. We respond to all enquiries within 2 hours during business hours.