Floor hacking is one of the most common and essential services in both renovation and reinstatement projects across Singapore. Whether you’re removing old tiles in your HDB flat, stripping vinyl flooring from a commercial space, or restoring an office to bare condition, proper floor hacking requires the right equipment, expertise, and knowledge of regulations.

At reinstatementworks.com.sg, floor hacking and tile removal is one of our most requested services. Here’s everything you need to know before starting your project.

Types of Flooring That Require Hacking

Ceramic and Porcelain Tiles

The most common flooring in Singapore homes and commercial spaces. Ceramic and porcelain tiles are bonded to the floor with cement adhesive and require mechanical hacking to remove. The process generates significant dust and noise, and the underlying screed may also need removal or repair.

Marble and Granite

Premium natural stone flooring found in high-end offices, hotel lobbies, and upscale retail spaces. Marble and granite are heavy and require careful hacking to avoid damaging the structural floor beneath. Disposal costs are higher due to the weight of the material.

Homogeneous Tiles

Extremely hard and durable tiles commonly used in commercial and industrial spaces. Homogeneous tiles are among the most difficult to hack due to their density. They require heavy-duty equipment and experienced operators.

Vinyl and Laminate Flooring

Vinyl sheets, vinyl tiles, and laminate planks are easier to remove than ceramic tiles. They can often be peeled or pried up without heavy hacking, though the adhesive residue underneath may need scraping or grinding.

Carpet Tiles

Common in office environments, carpet tiles are the easiest flooring to remove. They are typically laid on adhesive or held by their own weight and can be pulled up manually. However, the adhesive residue on the floor may need cleaning.

Raised Flooring

Many modern offices use raised access flooring systems that sit above the structural floor on adjustable pedestals. These can be dismantled without hacking, but the process requires careful handling to avoid damaging the panels if they are to be reused.

The Floor Hacking Process

Step 1: Assessment

We inspect the existing flooring to determine the type, thickness, and bonding method. We check for any services running beneath the floor — electrical conduits, water pipes, or data cables. For wet areas, we assess the waterproofing situation.

Step 2: Protection

We protect walls, door frames, and any areas not being hacked with padded coverings. In occupied buildings, we seal the work area to contain dust. We lay protective sheets along debris removal routes to prevent damage to common areas.

Step 3: Hacking

Using electric breakers, rotary hammers, and floor scrapers, our team systematically removes the flooring. We work section by section, starting from edges and working inward. For tiles, we break them into manageable pieces while being careful not to damage the screed or structural floor below.

Step 4: Screed Assessment

After tiles are removed, we assess the condition of the floor screed. If the screed is damaged or uneven, it may need to be hacked out and relaid. If reinstatement requires bare concrete, the entire screed layer must be removed.

Step 5: Debris Removal and Cleaning

All debris is collected in heavy-duty bags, transported to the loading area, and disposed of through licensed waste collectors. We clean the area thoroughly after each work session to maintain a safe work environment.

HDB Rules for Floor Hacking

If you’re hacking floors in an HDB flat, there are specific rules you must follow:

Waterproofing in Wet Areas

This is the most critical concern. Bathrooms, kitchens, and service yards have a waterproofing membrane beneath the tiles. If floor hacking damages this membrane, you must redo the waterproofing and conduct a ponding test to ensure no leaks to the unit below. The ponding test involves flooding the area with water for 24 to 48 hours and checking the ceiling of the unit below for leaks.

Renovation Permit

All floor hacking works in HDB flats require an HDB renovation permit. Your contractor must apply for this before starting work. The permit specifies the approved scope of work and timeline.

Working Hours

Hacking is only permitted Monday to Saturday, 9:00 AM to 6:00 PM. No hacking on Sundays and public holidays. Some estates may have additional restrictions during school examination periods.

Debris Disposal

Construction debris must be disposed of properly. You cannot dump hacking debris in HDB bin centres or common areas without approval. Your contractor should arrange for proper waste collection.

Noise and Dust Management

Floor hacking is one of the noisiest and dustiest construction activities. Professional management is essential:

Dust containment: We use plastic sheeting barriers, industrial vacuum systems, and wet cutting techniques to minimise airborne dust. Noise management: We schedule the noisiest work during approved hours and use equipment that minimises vibration to reduce disturbance to neighbours. Ventilation: Proper ventilation is maintained in the work area to protect workers and building occupants from dust inhalation. Daily cleanup: We clean the work area at the end of every session, removing all loose debris and dust.

Floor Hacking for Reinstatement

When your lease ends, floor hacking is often a major component of the reinstatement process. Landlords typically require:

Complete removal of all flooring installed during your tenancy. Removal of adhesive residue from the structural floor. Screed restoration if the original screed was damaged or modified. Surface preparation to leave the floor in a condition suitable for the next tenant’s flooring installation.

The level of restoration required depends on your lease agreement. Some landlords accept the floor at screed level, while others require the original flooring to be replaced. Check your reinstatement requirements carefully.

Disposing of Hacking Debris

Floor hacking generates a large volume of heavy debris. Proper disposal is both a legal requirement and a practical necessity:

All construction waste must go through licensed waste collectors approved by NEA. Debris cannot be mixed with general household or office waste. Different materials may need to be separated — concrete, tiles, wood, and metal. Your contractor should include debris disposal in their quotation. Illegal dumping can result in fines of up to $10,000.

Why Professional Floor Hacking Matters

Floor hacking looks simple but the risks of improper work are significant:

Waterproofing damage can cause leaks to the unit below, resulting in costly repairs and compensation claims. Structural damage from over-hacking can weaken the floor slab. Pipe and cable damage from hitting concealed services can cause floods or electrical hazards. Uneven surfaces from amateur hacking make it difficult to lay new flooring properly.

Our experienced team knows exactly how deep to hack, how to protect waterproofing, and how to avoid concealed services. Visit our hacking works page for more details.

Get a Free Quote for Your Floor Hacking Project

Whether you need tiles removed in one room or complete floor hacking across an entire commercial space, we provide free site inspections and transparent quotations.

Call us at 89289688 for a free consultation. Visit us at 24 Sin Ming Lane #03-92, Singapore, or check our FAQ page for more information.